How to Build a Timber Deck

How to Build a Timber Deck

Adding a timber deck to your home gives you more usable, comfortable living space and also adds value to your property.

Your tools:

•  Line level
•  Spirit level
•  Tape measure
•  Builders line
•  Screw gun
•  Spade
•  Skill saw
•  Mitre saw
•  Hammer
•  Drill & Bits

Deck terminology
Deck terminology


1.    Mark off the deck area

Using a string and profile boards, mark off the area that your deck will cover. Using a line level, make sure the strings are level. The strings will give a visualisation of the area of the deck and will serve as a guide for the posts and joist
positions.

Mark off the deck area

To make sure the area is square, do the following:

From the end of the string attached to the house wall, measure 3 metres along the string and mark with a felt pen. Measure 4 metres along the house wall in the other direction and mark. When the diagonal connecting these two points is 5 metres in length, the angle is 90o and the setup is square. (Use any 3 : 4 : 5 ratios.)

Make sure the diagonal distances between the two corners are the same.

make sure the area is square

2.    Clean the site

Remove all grass and other vegetation from the area that will be covered by the deck.
To ensure that all vegetation does not regrow, cover the area with USB material. This sheet can be covered in gravel or pebbles.

Clean the site

3.    Attaching the deck to the house

Install the ledger board to the brick wall using expansion bolts. As the ledger board will determine the level of the deck floor, make sure that it is at the correct height and is level. Note that the thickness of the deck boards must be allowed for. The deck should be below the DPC level.

Attaching the deck to the house

4.    Install the posts

Once the position of the posts is determined, mark the ground using a plumb line to get the position for the holes. The holes should be 500mm deep. Fill the bottom of the hole with 50mm of stone.

Install the posts

Then position the posts on this. Pour concrete into the hole and then ensure all posts are vertical and in alignment with one another. Support until the concrete is set - allow 24 hours. Ensure deck posts and joint support posts are CCA treated to a H4 specification.

position the posts

5.    Fitting beams to posts

Check that the concrete is set. If the string has been removed, reposition it.

Fitting beams to posts

Using a line level, transfer the height from the bottom of the ledger board to the posts. This will be the height that the top of the beams will be connected to the posts. Fix the beams to the posts as shown. Ensure ledger boards are CCA treated to a H2 specification.

Using a line level

6.    Attach joists

Mark the intermediate joist positions on the ledger. Intermediate joists are attached to the ledger using galvanised screws and joist hangers. The same joist positions are then transferred to the beams and outside joist. The intermediate joists are also fixed at these positions. Each outside joist is fixed to the intermediate joist using 3 x 75mm galvanised screws - countersunk. NOTE: Maximum cantilever is twice the nominal width of the timber i.e. 152mm wide joist cantilever is 152 x 2 = 305mm. Ensure intermediate and side joists are CCA treated to a H2 specification.

Attach joists

7.    Install deck boards

All deck boards must be fixed using zinc-coated decking screws (two screws per joist fixing). Whilst different decking patterns can be used, the simplest is to have boards of equal width set on the joists, with a small gap between the boards of ± 3mm. When laying decking, always keep checking the spacing and measurements from the starting point to ensure that the decking is laid evenly and parallel. If required, make small adjustments in the spacing. Note: Avoid cupping install boards with the growth rings pointing down. After fixing, cut all decking boards to ensure a straight line. A very neat finish is to cut boards flush with the joist and install a fascia.

Install deck boardsDECK12.jpg

8.    Install steps

For construction, measure the vertical rise from ground to deck surface and choose the best riser size for each step. This will give the number of steps. Also choose the best tread length from the table. Note the most popular is a 175mm rise to a 275mm tread length. The number of steps multiplied by the tread length gives the overall run of the stairs.

Install steps

9.    Install railings

Install posts for the railings at the required positions. The railing posts are bolted to the joists as shown. Ensure all railing posts are vertical. Once fixed, the horizontal railing supports can then be fixed to the posts, one 100mm above the deck, and one at the top of the post as shown.

Install railings